Black Cat was instructed by Bright Futures Educational Trust to work on the Design and Project Management of Rushbrook Primary Academy’s Multi-Use Games Area (MUGA) Sports Pitch, External Canopies, and Children’s Play Areas. In 2021, Black Cat produced a feasibility report to assess the construction, design options, planning, programming and budget costs, in line with the Client’s requirements.
-
Core Service
Project Management -
Sector
Public Sector -
Client Type
-
Location
Manchester
-
Size
15,274 ft²
The work comprised the construction of the MUGA, taking into account key elements including access, drainage, lighting, and fencing. Additionally, the provision of two new canopies were added to the KS1 classrooms, along with the refurbishment of the Nursery Play Area.
Our team provided the full design service including a topographical survey, proposed site plans and elevations required for planning permission, and the detailed design for the 2G MUGA and other facilities.
Black Cat managed the procurement of the project under our appointment as Contract Administrator and Principal Designer under the CDM Regulations. We managed the Design Team consultants and various specialists involved in the project from inception through to completion.