Black Cat were instructed to undertake a feasibility report on the re-purposing of an existing materials practical/teaching space to form a separate science laboratory and food technology practical classroom. We provided options along with associated costs, timeframes and risks

We were then instructed to design and contract administer the works through to completion in a short time frame over the summer holidays. The design required an understanding of the existing schools design, standard space planning and the relevant building bulletins for good design guidance in schools.

Regular and consistent communication with all parties was key to the successful delivery of this project and we ensured we allowed sufficient resource and had regular meetings with all parties to fully understand the brief and ensure it was successfully translated in the design and onto site. The job was completed to a very challenging time scale and within budget.

View all Case Studies

Back to Case Studies

Next Case Study

Denton CC

Get in touch

We do the detail so you don't have to

Contact our specialist team today and find out how we can help.

Get in touch