Back to Case Studies

Bridge House

Project Management

Following completion of the acquisition survey of this 1960’s office building in early 2019, Black Cat were subsequently appointed to project manage its refurbishment.

 

An initial strip out contract was carried out during the design stages to compress overall programme. Strip out work involved taking the building back to shell whilst working around two retained tenants.

The proposed scope of refurbishment works will provide a contemporary space which will appeal to modern ‘tech’ occupiers. The existing reception area (pictured) will be significantly enlarged to improve the visitor experience and will be finished in high quality materials