Back to Case Studies

25 Saville Row

Facade Consultancy

Black Cat Building Consultancy was instructed to carry out a non-intrusive inspection Façade Fire Risk Assessment (FFRA) of the cladding systems at 25 Saville Row for our client, Derwent London.

Alongside an initial assessment, our Façade Team cover the scopes of the façade configuration and materials of the property, as well as their compliance in terms of fire. This first assessment was part of a five year Planned Preventative Maintenance Report (PPM), to provide a schedule establishing budgets for the future maintenance of the property.

View all Case Studies

Back to Case Studies

Next Case Study

The Strand, Bootle

Get in touch

We do the detail so you don't have to

Contact our specialist team today and find out how we can help.

Get in touch